Lainz Tunnel, contract section LT31, Austria
The Project:
Construction of a 4km two-track railway tunnel in Vienna
Executing companies:
ARGE LT31 consisting of:
Hochtief Construction AG
Alpine Bau GmbH
Beton- und Monierbau GmbH
The problem:
Water removal from both tunnel tubes during tunnelling works (through loose rock). 5 emergency exit shafts, 30 to 55m deep. Quarrying areas 132 and 145 m2, 6 to 20m beneath existing buildings.
The solution:
Multiple submersible pumps from the KTV, KTZ and LH series. The special characteristics of Tsurumi pumps,such as an internal mechanical seal, upstream shaft sleeve with gasket and an oil lifter allow them to be used in on-snore-mode over an extended period.
En el caso de utilizarse con productos abrasivos y corrosivos, determinados componentes sufrirán un desgaste más intenso de forma natural. En relación con la aplicación indicada más arriba, dicho desgaste se puede producir principalmente en el impulsor, el agitador, la placa de succión, el casquillo del eje, el anillo de engrase, el sello mecánico, la carcasa de la bomba, el colador, la carcasa del motor y el acoplamiento de descarga. En función de las condiciones de trabajo, la vida útil de estas piezas puede variar significativamente y puede ser inferior al período de garantía legal.
En este sentido, son de aplicación nuestros
términos y condiciones generales, que también le podemos enviar por correo electrónico si lo solicita.