The Project:


Extension of the L433 road Velbert/Langenberg


Executing company:

Wayss & Freytag Ing. Bau AG


The Problem:


The ground water must be pumped off. Continuous truck traffic has to be ensured due to the traditional excavation by means of building machines, i.e. pollution by mud must be prevented by continuously pumping off in pumping on snore mode.


Our Solution:


Lowering the ground water table by means of contractors' pumps of the KTZ and KTV series. Our pumps are provided with a patented oil lifter which ensures lubrication and cooling of the mechanical seal even at a minimum oil level.

Twenty-four-hour pumping on snore mode without failure has been implemented for months now due to this particular feature.

En el caso de utilizarse con productos abrasivos y corrosivos, determinados componentes sufrirán un desgaste más intenso de forma natural. En relación con la aplicación indicada más arriba, dicho desgaste se puede producir principalmente en el impulsor, el agitador, la placa de succión, el casquillo del eje, el anillo de engrase, el sello mecánico, la carcasa de la bomba, el colador, la carcasa del motor y el acoplamiento de descarga. En función de las condiciones de trabajo, la vida útil de estas piezas puede variar significativamente y puede ser inferior al período de garantía legal.
En este sentido, son de aplicación nuestros términos y condiciones generales, que también le podemos enviar por correo electrónico si lo solicita.