Direkt zum Inhalt | Direkt zur Navigation
Usted está aquí:

Dülmen micro-tunneling, Germany

The Project:


Dülmen canal construction - micro tunneling, Germany


Executing company:

Fa. Jordan Tiefbau GmbH & Co. KG

Kierdorfer Str. 65

D-50169 Kerpen


The Problem:


The soil loosened at the fron when heading is returned to the pressing pit and must be removed here and disposed.


Our Solution:


The viscous concentrated soil could be sucked off ba a KTZ pump with "suction hat" (reversed inlet strainer).

The specific advantage was the operation of the pump which could be used also during pressing. Transporting off was simple as it was possible to pump the drilling material directly into the containers provided.

No tank truck was necessary.

En el caso de utilizarse con productos abrasivos y corrosivos, determinados componentes sufrirán un desgaste más intenso de forma natural. En relación con la aplicación indicada más arriba, dicho desgaste se puede producir principalmente en el impulsor, el agitador, la placa de succión, el casquillo del eje, el anillo de engrase, el sello mecánico, la carcasa de la bomba, el colador, la carcasa del motor y el acoplamiento de descarga. En función de las condiciones de trabajo, la vida útil de estas piezas puede variar significativamente y puede ser inferior al período de garantía legal.
En este sentido, son de aplicación nuestros términos y condiciones generales, que también le podemos enviar por correo electrónico si lo solicita.