BBC Center Böblingen

The Project:


Water drainage in a 12,000m3 pit



Fischer Weilheim Construction Company

Dealer Schmittinger Köngen

Companies involved with legal status and location


Task

Ground and rainwater drainage for a 12,000m3-large pit over 17 months. All incoming groundwater and rainwater must be disposed of.


KTZ-series pumps with control units are installed in collector shafts with electrode control – four KTZ 33.7. The shafts have a diameter of only 400 mm, so slim, space-saving pumps are required.


The solution:


The individual shafts are equipped with 16 pumps of the LB series with electrode control type LB 480 with electrode

En el caso de utilizarse con productos abrasivos y corrosivos, determinados componentes sufrirán un desgaste más intenso de forma natural. En relación con la aplicación indicada más arriba, dicho desgaste se puede producir principalmente en el impulsor, el agitador, la placa de succión, el casquillo del eje, el anillo de engrase, el sello mecánico, la carcasa de la bomba, el colador, la carcasa del motor y el acoplamiento de descarga. En función de las condiciones de trabajo, la vida útil de estas piezas puede variar significativamente y puede ser inferior al período de garantía legal.