The Project:


Construction of a 3,200 m long road tunnel


Executing companies:

ARGE Tunnel Achrain/Österreich

Beton- u. Monierbau Gesellschaft m.b.H.

Alpine Mayreder Bau GmbH

Jäger Bau GmbH


The Problem:


Drainage during the complete tunnel heading work.


Our Solution:


Use of type KTZ32.2 submersible pumps. These are operated in 24-hour snore mode.

Thanks to their special properties including their internal rotating mechanical seal and upstream shaft protection sleeve with seal, the Tsurumi pumps can be operated in 24-hour snore mode.


The advantages of this design are:

  • Extended service lives
  • Lower costs for spare parts
  • Lower labour costs
En el caso de utilizarse con productos abrasivos y corrosivos, determinados componentes sufrirán un desgaste más intenso de forma natural. En relación con la aplicación indicada más arriba, dicho desgaste se puede producir principalmente en el impulsor, el agitador, la placa de succión, el casquillo del eje, el anillo de engrase, el sello mecánico, la carcasa de la bomba, el colador, la carcasa del motor y el acoplamiento de descarga. En función de las condiciones de trabajo, la vida útil de estas piezas puede variar significativamente y puede ser inferior al período de garantía legal.