Direkt zum Inhalt | Direkt zur Navigation
You are here:

Tunnel Vomp, Austria

The Project:


Construction of a railway tunnel with a length of 8000 m.


Executing company:

ARGE Tunnel Vomp, Österreich

Strabag AG

Ed. Zübiln AG

Hochtief Construction AG


The Problem:


Drainage during the earth tunnel heading with the aid of submersible pumps.


Our Solution:


Use of Tsurumi type KTV2-22, KTV2-55 and KTZ32.2 in 24-hour snore mode.A total of some 35 Tsurumi pumps are in use.

In the event of abrasive and corrosive utilization, stronger wear and tear will take place naturally in certain components. With regards to the above application wear and tear can take place mainly in impeller, agitator, suction plate, shaft sleeve, oil ring, mechanical seal, pump casing, strainer, motor casing and discharge coupling. Depending on the working conditions the lifetime of those parts might vary significantly and can be shorter than the legal warranty period.
In this regard, please pay attention to our general terms and conditions that we also send to you by mail on request.