The project:
New building of second Rhine Bridge
Executing company:
Max Bögl Bauunternehmung GmbH & Co. KG
The new bridge project, built 36 metres away from the old bridge, is a total of 745 metres in length. The section over the Rheinstrom is 322 metres long.
The problem:
Pumping off the water and concrete mixture created in the course of boring piles that are 900mm in diameter at a depth of up to 50m into the ground for soil stabilization.
Our solution:
Use of a KTZ411 Tsurumi pump for securing the boring piles during the casting phase. The unit is used to pump out the mixture of water and concrete.