Direkt zum Inhalt | Direkt zur Navigation
Jūs esate čia:

Schwarzbach pipe heading, Germany

The Project:


Gelsenkirchen pipe heading, Schwarzbach canal, Germany

Executing company: WÜWA Bau GmbH


The Problem:


The material excavated by the micro-tunnelling machine is pumped by a mud pump into a separating system where coarse parts are separated. The remaining highly abrasive sludge is passed into a receiver. The material deposits due to the intermittent operation of the pump.


Our Solution:


A KRS2-80 with agitator whirls up the abrasive sludge so that it can be pumped off without any problem. Minimum wear is possible due to the application of components of grey cast and chromium cast iron (25% chromium portion).

Aplinkoje, kur yra braižančių dalelių ir korozinių medžiagų, tam tikri komponentai natūraliai dėvisi greičiau. Eksploatuojant pirmiau minėtomis sąlygomis, sparčiau dėvisi sparnuotė, maišytuvas, siurbimo plokštė, veleno sandariklis, alyvos žiedas, mechaninis sandariklis, siurblio korpusas, koštuvas, variklio korpusas ir išleidimo mova. Atsižvelgiant į darbines sąlygas, šių dalių eksploatacija gali gerokai sutrumpėti ir nesiekti įstatymais nustatyto garantijos laikotarpio.
Tokiu atveju reikia atidžiai perskaityti mūsų bendrąsias sąlygas ir nuostatus, kuriuos, gavę atskirą užklausą, galime išsiųsti paštu.