Direkt zum Inhalt | Direkt zur Navigation
Jūs esate čia:

Dülmen micro-tunneling, Germany

The Project:


Dülmen canal construction - micro tunneling, Germany


Executing company:

Fa. Jordan Tiefbau GmbH & Co. KG

Kierdorfer Str. 65

D-50169 Kerpen


The Problem:


The soil loosened at the fron when heading is returned to the pressing pit and must be removed here and disposed.


Our Solution:


The viscous concentrated soil could be sucked off ba a KTZ pump with "suction hat" (reversed inlet strainer).

The specific advantage was the operation of the pump which could be used also during pressing. Transporting off was simple as it was possible to pump the drilling material directly into the containers provided.

No tank truck was necessary.

Aplinkoje, kur yra braižančių dalelių ir korozinių medžiagų, tam tikri komponentai natūraliai dėvisi greičiau. Eksploatuojant pirmiau minėtomis sąlygomis, sparčiau dėvisi sparnuotė, maišytuvas, siurbimo plokštė, veleno sandariklis, alyvos žiedas, mechaninis sandariklis, siurblio korpusas, koštuvas, variklio korpusas ir išleidimo mova. Atsižvelgiant į darbines sąlygas, šių dalių eksploatacija gali gerokai sutrumpėti ir nesiekti įstatymais nustatyto garantijos laikotarpio.
Tokiu atveju reikia atidžiai perskaityti mūsų bendrąsias sąlygas ir nuostatus, kuriuos, gavę atskirą užklausą, galime išsiųsti paštu.