Direkt zum Inhalt | Direkt zur Navigation
Jūs esate čia:

ARGE tunnel Grouft, Luxemburg

The project:


ARGE Tunnel Grouft, Lorenzweiler, Luxemburg


Executing companies:

Wayss & Freytag Ingenieurbau AG,

Max Bögl Bauunternehmung GmbH & Co. KG

Societe de Travaux Galere s.a.

Tralux s.a.r.

Felix Giorgetti s.a.r.


An approximately three km long tunnel is being built north of the city of Luxemburg. It is part of the new section of the "Route du Nord" and consists of two tunnels from which one three-lane and one two-lane tunnel have a gradient of almost 4,5%. The tunnelling work is being performed using conventional construction methods and explosives. The tunnel connects the Heeschdrëfferbierg plateau in the south and the Alzettetal near Lorentzweiler in the north. This will create a section connecting to the important north-south track in Luxemburg.


The problem:


Open drainage during tunnelling and construction in the open with the help of submersible pumps.


Our solution:


Producing a drainage concept. Types used:

KTZ22.2, KTZ32.2, KTZ45.5, KTZ47.5, LH25.5W

Aplinkoje, kur yra braižančių dalelių ir korozinių medžiagų, tam tikri komponentai natūraliai dėvisi greičiau. Eksploatuojant pirmiau minėtomis sąlygomis, sparčiau dėvisi sparnuotė, maišytuvas, siurbimo plokštė, veleno sandariklis, alyvos žiedas, mechaninis sandariklis, siurblio korpusas, koštuvas, variklio korpusas ir išleidimo mova. Atsižvelgiant į darbines sąlygas, šių dalių eksploatacija gali gerokai sutrumpėti ir nesiekti įstatymais nustatyto garantijos laikotarpio.
Tokiu atveju reikia atidžiai perskaityti mūsų bendrąsias sąlygas ir nuostatus, kuriuos, gavę atskirą užklausą, galime išsiųsti paštu.