Direkt zum Inhalt | Direkt zur Navigation
Jūs esate čia:

Lindner-Werke, Dettelbach, Germany

The Project:


Industrial manufacture of gypsum fibreboard panels


Companies involved:

Lindner GFT GmbH

Grebner Reinigungssysteme (Cleaning Systems)


The Problem:


Pumping of residual water containing gypsum from the production process, with a solids content of 15-20%. The pumps are required to operate in "on-snore-mode", with fluctuating delivery volumes.


The Solution:


Use of one pump each of the types KTV2-50 and KTV2-80 with stirring systems (weight 24kg and 37kg in each case). These types are easy to clean and, with the aid of the stirring systems, can pump water containing solids without any problems. First maintenance was carried out after 16 months, and the oil was absolutely perfect. The only replacements made were the shaft protection sleeve, the shaft sealing ring and the rubber parts of the pump housing.

Aplinkoje, kur yra braižančių dalelių ir korozinių medžiagų, tam tikri komponentai natūraliai dėvisi greičiau. Eksploatuojant pirmiau minėtomis sąlygomis, sparčiau dėvisi sparnuotė, maišytuvas, siurbimo plokštė, veleno sandariklis, alyvos žiedas, mechaninis sandariklis, siurblio korpusas, koštuvas, variklio korpusas ir išleidimo mova. Atsižvelgiant į darbines sąlygas, šių dalių eksploatacija gali gerokai sutrumpėti ir nesiekti įstatymais nustatyto garantijos laikotarpio.
Tokiu atveju reikia atidžiai perskaityti mūsų bendrąsias sąlygas ir nuostatus, kuriuos, gavę atskirą užklausą, galime išsiųsti paštu.