The project:


Construction of underground tunnel line 3 North, lot 1

Execution companies:

Consortium U-Bahn Linie 3 Nord

Ed. Züblin AG, Ndl. Tunnelbau

Ed. Züblin AG, Ndl. München


The problem:


Pumping off the water arising during mined underground tunnel heading.


Our solution:


Use of 9 submersible waste water pumps of Type KTZ32.2.

Because of the highly calcareous water deposits occur in the pump hydraulics resulting in pump blocking. However, due to the mechanical seal positioned completely inside und the additional shaft protection sleeve with sealing ring the pump can be put quickly with little effort and without exchanging any wear parts back into operation again.

Aplinkoje, kur yra braižančių dalelių ir korozinių medžiagų, tam tikri komponentai natūraliai dėvisi greičiau. Eksploatuojant pirmiau minėtomis sąlygomis, sparčiau dėvisi sparnuotė, maišytuvas, siurbimo plokštė, veleno sandariklis, alyvos žiedas, mechaninis sandariklis, siurblio korpusas, koštuvas, variklio korpusas ir išleidimo mova. Atsižvelgiant į darbines sąlygas, šių dalių eksploatacija gali gerokai sutrumpėti ir nesiekti įstatymais nustatyto garantijos laikotarpio.
Tokiu atveju reikia atidžiai perskaityti mūsų bendrąsias sąlygas ir nuostatus, kuriuos, gavę atskirą užklausą, galime išsiųsti paštu.