Syphon construction under nature reserve Löcknitztal by microtunnelling

The project:


Pipe heading DN 1600 by micro-tunnelling with reinforced concrete driving pipes for passing under the nature reserve Löcknitztal near Kienbaum (Land Brandenburg) as protective pipe for a high-pressure gas pipeline DN 1100.

Client:

Ruhrgas AG/Verbundnetz Gas AG

Executing company:

Gildemeister Tief-, Stahlbeton- und

Rohrleitungsbau GmbH&Co. KG Berlin


The problem:


Pumping off the supporting liquid (bentonite suspension) used in the tunnel during pipe heading.


Our solution:


Application of a submersible pump Type KTZ35.5 connected with an accompanying pipe line DN 100 for continuous removal of the supporting liquid during the whole time of pipe heading.

The pump was always positioned at the lowest point of the syphon and operated on snore mode.

Aplinkoje, kur yra braižančių dalelių ir korozinių medžiagų, tam tikri komponentai natūraliai dėvisi greičiau. Eksploatuojant pirmiau minėtomis sąlygomis, sparčiau dėvisi sparnuotė, maišytuvas, siurbimo plokštė, veleno sandariklis, alyvos žiedas, mechaninis sandariklis, siurblio korpusas, koštuvas, variklio korpusas ir išleidimo mova. Atsižvelgiant į darbines sąlygas, šių dalių eksploatacija gali gerokai sutrumpėti ir nesiekti įstatymais nustatyto garantijos laikotarpio.