Direkt zum Inhalt | Direkt zur Navigation
Jūs esate čia:

Inland waterway canal Hohenems, Austria

The Project:


Construction of the inland waterway canal as well as the installation of concrete girders for securing purposes in Hohenems, Austria


Executing company:

Hilti & Jehle, Feldkirch, Austria


The Problem:


Pumping off dirty water with high levels of sludge (turf, humus, sand).


Our Solution:


Use of two Tsurumi KRS2-100s with agitator in baskets with 30 mm perforations. The stirrer mounted on the shaft swirls up the medium and ensures that slick, sand and sludge can be conveyed away without any problem. In this way the pump basket remains unclogged and the pump line does not get blocked. In this way the work of one man for maintaining the pumps and pressure line was saved. Previously the pumps had to be frequently opened and the silted-up pipes dried and cleaned.

Aplinkoje, kur yra braižančių dalelių ir korozinių medžiagų, tam tikri komponentai natūraliai dėvisi greičiau. Eksploatuojant pirmiau minėtomis sąlygomis, sparčiau dėvisi sparnuotė, maišytuvas, siurbimo plokštė, veleno sandariklis, alyvos žiedas, mechaninis sandariklis, siurblio korpusas, koštuvas, variklio korpusas ir išleidimo mova. Atsižvelgiant į darbines sąlygas, šių dalių eksploatacija gali gerokai sutrumpėti ir nesiekti įstatymais nustatyto garantijos laikotarpio.
Tokiu atveju reikia atidžiai perskaityti mūsų bendrąsias sąlygas ir nuostatus, kuriuos, gavę atskirą užklausą, galime išsiųsti paštu.