The Project:


Connection of the newly built road for Cologne/Bonn airport

Executing Company

Heitkamp GmbH, Wayss&Freytag AG,

Trapp GmbH


The Problem:


Maintainance of water level in a rainwater storage basin at the building site.


Our Solution:


Installation of 2 submersible pumps KTVE21.5 and KTVE22.2. The advantage here is in the integrated level control unit via electrodes. A separate floater cable does not have to be laid. The space required is determined by the diameter of the pump. In contrast to floaters, electrodes do not have to be readjusted. The level can be varied without any difficulty by mounting a screw.

Aplinkoje, kur yra braižančių dalelių ir korozinių medžiagų, tam tikri komponentai natūraliai dėvisi greičiau. Eksploatuojant pirmiau minėtomis sąlygomis, sparčiau dėvisi sparnuotė, maišytuvas, siurbimo plokštė, veleno sandariklis, alyvos žiedas, mechaninis sandariklis, siurblio korpusas, koštuvas, variklio korpusas ir išleidimo mova. Atsižvelgiant į darbines sąlygas, šių dalių eksploatacija gali gerokai sutrumpėti ir nesiekti įstatymais nustatyto garantijos laikotarpio.
Tokiu atveju reikia atidžiai perskaityti mūsų bendrąsias sąlygas ir nuostatus, kuriuos, gavę atskirą užklausą, galime išsiųsti paštu.