Direkt zum Inhalt | Direkt zur Navigation
Jūs esate čia:

RWE brown coal open-cast mine, Indem

The Project:


Pumping surface water from the main level of the Indem open-cast mine into the receiving body of water


Executing company

RWE Power AG, Braunkohletagebau Indem


The Problem:


The surface water, which arises discontinuously from the complete Indem open-cast mine, is first taken up in the main level. From here it is pumped continuously into the receiving body of water. Requirement to be satisfied by the pump: maximum delivery performance at pressure variations from 3,5 to 4,5 bar.


Our Solution:


Use of a high-pressure pump of type LH855 with 55 kW. This delivers the water into the existing pressure line at the rate of 5,7 m3/min at a pressure of 3,5 bar. Since the Tsurumi pump can be operated not only vertically but also horizontally, it can be connected perfectly to the existing pressure line.

Aplinkoje, kur yra braižančių dalelių ir korozinių medžiagų, tam tikri komponentai natūraliai dėvisi greičiau. Eksploatuojant pirmiau minėtomis sąlygomis, sparčiau dėvisi sparnuotė, maišytuvas, siurbimo plokštė, veleno sandariklis, alyvos žiedas, mechaninis sandariklis, siurblio korpusas, koštuvas, variklio korpusas ir išleidimo mova. Atsižvelgiant į darbines sąlygas, šių dalių eksploatacija gali gerokai sutrumpėti ir nesiekti įstatymais nustatyto garantijos laikotarpio.
Tokiu atveju reikia atidžiai perskaityti mūsų bendrąsias sąlygas ir nuostatus, kuriuos, gavę atskirą užklausą, galime išsiųsti paštu.