Direkt zum Inhalt | Direkt zur Navigation
Jūs esate čia:

Schalkshofen pumping station, Germany

The project:

Replacement of a dry-installed pump at the Schalkshofen pumping station by a submersible pump with cutter. Sewage disposal for the municipality of Oberroth with approx. 890 inhabitants.

Executing company:

Landmaschinen Mayer, Unterroth


Tsurumi project leader:

Ernst Mutzel

(Field Sales for Baden-Württemberg)


The problem:

Formation of ragging in operation, causing a gradual loss of performance and eventually stopping the pump, thereby triggering an alarm due to high water level.

Pump has to be dismantled regularly to remove the ragging.


The solution:

Installation of a type 100C43.7 grinder pump. The impeller shreds the fibrous constituents of the sewage. This prevents ragging and guarantees trouble-free operation, with fewer time-consuming repairs by the sewage works operators.

Aplinkoje, kur yra braižančių dalelių ir korozinių medžiagų, tam tikri komponentai natūraliai dėvisi greičiau. Eksploatuojant pirmiau minėtomis sąlygomis, sparčiau dėvisi sparnuotė, maišytuvas, siurbimo plokštė, veleno sandariklis, alyvos žiedas, mechaninis sandariklis, siurblio korpusas, koštuvas, variklio korpusas ir išleidimo mova. Atsižvelgiant į darbines sąlygas, šių dalių eksploatacija gali gerokai sutrumpėti ir nesiekti įstatymais nustatyto garantijos laikotarpio.
Tokiu atveju reikia atidžiai perskaityti mūsų bendrąsias sąlygas ir nuostatus, kuriuos, gavę atskirą užklausą, galime išsiųsti paštu.