Direkt zum Inhalt | Direkt zur Navigation
Jūs esate čia:

Petersdorf sewage treatment plant, Malchow, Germany

The project:

Renovation of the sewage treatment plant to permit reliable wastewater treatment in the tourist area for vacation season.


Executing company:

Malchow Municipal Utilities as customer

ROTARIA Energie- u. Umwelttechnik GmbH, Rerik


Tsurumi consultants:

Mr. Thomas Elendt (External sales force East)


The problem:

The eastern part of the Plauer See is characterised by tourism. As a result, the volume of wastewater triples during vacation season. The sewage treatment plant no longer reflected the state of the art and had insufficient capacity. The mechanically pretreated wastewater must be mixed with air to ensure nitrification and subsequent denitrification.


The solution:

The use of three Tsurumi BER immersible ventilators (ejectors) for oxygen enrichment of the wastewater in each of two basins. Simple installation and service in comparison with plate ventilation. The second basin is then put into operation as the number of vacationers increases or during service work.

Aplinkoje, kur yra braižančių dalelių ir korozinių medžiagų, tam tikri komponentai natūraliai dėvisi greičiau. Eksploatuojant pirmiau minėtomis sąlygomis, sparčiau dėvisi sparnuotė, maišytuvas, siurbimo plokštė, veleno sandariklis, alyvos žiedas, mechaninis sandariklis, siurblio korpusas, koštuvas, variklio korpusas ir išleidimo mova. Atsižvelgiant į darbines sąlygas, šių dalių eksploatacija gali gerokai sutrumpėti ir nesiekti įstatymais nustatyto garantijos laikotarpio.
Tokiu atveju reikia atidžiai perskaityti mūsų bendrąsias sąlygas ir nuostatus, kuriuos, gavę atskirą užklausą, galime išsiųsti paštu.