Direkt zum Inhalt | Direkt zur Navigation

Feldhofe mud dump site, Germany

The Project:


To treat the surface discharge water before it enters the receiving water course.


Executing company:

Firma PLA Pumpen und Anlagenbau GmbH

22844 Norderstedt


The problem:


The discharge water of the Feldhofe mud dumpsite is heavily laden with Fe-ions. Treatment of the surface discharge water is necessary before it enters the receiving watercourse.


The solution:


Treatment via oxidation and iron oxide precipitation, assisted by a 2.2kW submersible aerator. Since the bottom of the natural water body is uneven and muddy, a base plate was welded on and the aerator sunk using a crane. Oxygen measurements made after installation (using DO electrodes) were highly satisfactory.

Aplinkoje, kur yra braižančių dalelių ir korozinių medžiagų, tam tikri komponentai natūraliai dėvisi greičiau. Eksploatuojant pirmiau minėtomis sąlygomis, sparčiau dėvisi sparnuotė, maišytuvas, siurbimo plokštė, veleno sandariklis, alyvos žiedas, mechaninis sandariklis, siurblio korpusas, koštuvas, variklio korpusas ir išleidimo mova. Atsižvelgiant į darbines sąlygas, šių dalių eksploatacija gali gerokai sutrumpėti ir nesiekti įstatymais nustatyto garantijos laikotarpio.
Tokiu atveju reikia atidžiai perskaityti mūsų bendrąsias sąlygas ir nuostatus, kuriuos, gavę atskirą užklausą, galime išsiųsti paštu.