Direkt zum Inhalt | Direkt zur Navigation
Jūs esate čia:

Well pump at Eternit AG, Germany

The project:

Reconstruction of a well, installation and adaptation of a new pump


Customer:

Eternit AG


Performing company:

Haugrund und Runte Elektromaschinenbau GmbH


Project lead at Tsurumi:

Mr. Jürgen Rohring (Regional Sales Lead Construction NRW)


The problem:

Rebuilding of a well system.

Measure: Replacement of three small pumps of "lumberyard quality".

The use of a higher-quality product should permit longer service life and adjustment of each water fountain.


The solution:

Replacement of the three pumps with a Tsurumi model 50UT2.75S (750W, 230V) submersible pump.

This is a portable, rugged pump in a cast iron variant with a vortex impeller.

The pump was modified in such a way that three fountain nozzles can be operated with the option of controlling each water fountain individually or all together.

Aplinkoje, kur yra braižančių dalelių ir korozinių medžiagų, tam tikri komponentai natūraliai dėvisi greičiau. Eksploatuojant pirmiau minėtomis sąlygomis, sparčiau dėvisi sparnuotė, maišytuvas, siurbimo plokštė, veleno sandariklis, alyvos žiedas, mechaninis sandariklis, siurblio korpusas, koštuvas, variklio korpusas ir išleidimo mova. Atsižvelgiant į darbines sąlygas, šių dalių eksploatacija gali gerokai sutrumpėti ir nesiekti įstatymais nustatyto garantijos laikotarpio.
Tokiu atveju reikia atidžiai perskaityti mūsų bendrąsias sąlygas ir nuostatus, kuriuos, gavę atskirą užklausą, galime išsiųsti paštu.