The project:
Renovation of the U3 between the Olympia shopping centre and Moosach
Executing company:
ARGE U-Bahn Line 3 North, construction lot 2: Wayss&Freytag Ingenieurbau Hochtief Construction Bauer Spezialtiefbau
The problem:
Groundwater drainage during the entire construction phase: Laying of sewers, construction of subway tunnels and stations.
Our solution:
Multiple submersible pumps from the LSC series (puddle sucker) were used. The special characteristics of Tsurumi pumps, such as an internal mechanical seal, upstream shaft sleeve with gasket and a patented oil lifter allow them to be used in snore mode over an extended period.