The Project:
Renovation of a clarification plant
Companies involved:
OÜ Impel Ltd (Tsurumi Partner)
The Problem:
Replacement of the clarification technology, Installation of new items of equipment.
The Solution:
Preliminary clarification:
Installation of a screen of the Tsurumi type KS- 200z-2.5, with the aid of which solids are removed from the waste water.
Activated sludge aeration:
Installation of three compressors of the Tsurumi type RSR-80, each rated at 5.5kW, 1750 rev/min. Two compressors are in permanent operation, with another in standby mode. The compressors stand on a vibration damping base made of rubber, in order to keep noise levels low.
Surface suction removal:
A floating surface suction unit of the Tsurumi type 4-FSP removes foam and floating dirt from the water surface by suction.
Pumps:
Five pumps of the 40UA2.25 type are in operation at different points in the purification process.