The project:
Tunnel on the E6 South section between Vinterbro and Assurtjen, 3.605 m in length
Executing companies:
Mika AS
Intec Pumper AS
The problem:
With a falling road grade in the tunnel, the water runoff from the mountain had to be pumped upwards over longer distances.
Our solution:
Use of multiple module KTV and LH pumps. Particularly the LH series provides the conveyor pressure needed to overcome the distances between the intermediate basins.