RWE brown coal open-cast mine, Indem

The Project:


Pumping surface water from the main level of the Indem open-cast mine into the receiving body of water


Executing company

RWE Power AG, Braunkohletagebau Indem


The Problem:


The surface water, which arises discontinuously from the complete Indem open-cast mine, is first taken up in the main level. From here it is pumped continuously into the receiving body of water. Requirement to be satisfied by the pump: maximum delivery performance at pressure variations from 3,5 to 4,5 bar.


Our Solution:


Use of a high-pressure pump of type LH855 with 55 kW. This delivers the water into the existing pressure line at the rate of 5,7 m3/min at a pressure of 3,5 bar. Since the Tsurumi pump can be operated not only vertically but also horizontally, it can be connected perfectly to the existing pressure line.

Σε περίπτωση χρήσης λειαντικού ή διαβρωτικού μέσου, μπορεί να προκληθεί μεγάλη φθορά σε ορισμένα εξαρτήματα. Αναφορικά με την παραπάνω εφαρμογή, μπορεί να προκληθεί φθορά κυρίως στην πτερωτή, στον αναδευτήρα, στην πλάκα αναρρόφησης, στο χιτώνιο ολίσθησης του άξονα, στον δακτύλιο λίπανσης, στo μηχανικό στεγανωτικό παρέμβυσμα, στο περίβλημα της αντλίας, στο φίλτρο, στο κιβώτιο του κινητήρα και στον άξονα σύζευξης του συστήματος αποστράγγισης. Η διάρκεια ζωής αυτών των εξαρτημάτων μπορεί να διαφέρει σημαντικά και μπορεί να είναι συντομότερη από εκείνη της περιόδου της εγγύησης κατά τον νόμο, εξαρτάται από τις συνθήκες εργασίας.
Όσον αφορά αυτό θα πρέπει να δοθεί προσοχή στους γενικούς όρους και κανονισμούς που σας έχουμε επίσης στείλει μέσω ταχυδρομείου κατόπιν αιτήματος.