Waste water channel, Belgrade, Serbia

The Project:


Construction of a waste-water channel in Belgrade with 1500mm diameter


Executing companies:

Ferbild d.o.o., Belgrade

Vedir-Impex d.o.o.


The problem:


Laying of pipes with 1500mm diameter at a depth of 8m. Proximity to the Danube means that groundwater occurs at only 3m depth. Accordingly, the construction site was 5m below the groundwater level along its entire length. Since the ground contains a high proportion of grit, difficulties were encountered in lowering the groundwater.


The solution:


12 wells sunk to depths of up to 25m were drilled parallel to the new canal. At this depth the ground consists of shingle and groundwater could be pumped with ease. 15 Tsurumi pumps were used, of types KTZ611,KTZ35.5, KTZ22.2, KTVE35.5 and LH615.

Σε περίπτωση χρήσης λειαντικών και διαβρωτικών μέσω, σε ορισμένα εξαρτήματα θα υπάρξει πιο έντονη φθορά. Η προαναφερθείσα φθορά μπορεί να σημειωθεί κυρίως στην πτερωτή, στον αναδευτήρα, στην πλάκα αναρρόφησης, στον ατέρμονα κοχλία, στο δακτύλιο λίπανσης, στο μηχανικό στεγανωτικό παρέμβυσμα, στο περίβλημα αντλίας, στο πώμα εκκένωσης, στο περίβλημα κινητήρα και στη σύζευξη εκκένωσης. Ανάλογα με τις συνθήκες εργασίας, η διάρκεια ζωής αυτών των εξαρτημάτων ενδέχεται να ποικίλλει σημαντικά και μπορεί να είναι μικρότερη από τη νόμιμη χρονική περίοδο της εγγύησης.
Λόγω αυτού, θα πρέπει να δώσετε προσοχή στους γενικούς όρους και τις προϋποθέσεις μας τα οποία σας στέλνουμε μέσω email κατόπιν αιτήματος.