Gotthard Basistunnel, Switzerland

The project:


Railway Tunnel Alptransit Gotthard,

Sedrun Section


Executing companies:

ARGE Transco Sedrun

Batigroup AG Tunnelbau,

Frutiger AG

Impresa Pizzarotti & C.S.p.


The "Sedrun Section" of the Gotthard Basistunnel encompasses two tunnels that are each 6,2 kilometres long and supplied through a 800m deep mine shaft. Two tunnels are at the base of the shaft and each breaks through to the north and south in the conventional manner.

The project tunnels through the unstable rock of the Tavetscher Zwischenmassiv with an up to 2.000m overlay. One of the two multifunctional sections of the 57 km long Gotthardbasis Tunnel is also being built in the Sedrun section.


The problem:


Pumping off the abrasive water that collects during the tunnelling excavations.


Our solution:


Use of the current 80+ Tsurumi wastewater submersible pumps for complete drainage. Pump series used: KTZ, KRS, KTV, LH, KRS with agitator.

Σε περίπτωση χρήσης λειαντικών και διαβρωτικών μέσω, σε ορισμένα εξαρτήματα θα υπάρξει πιο έντονη φθορά. Η προαναφερθείσα φθορά μπορεί να σημειωθεί κυρίως στην πτερωτή, στον αναδευτήρα, στην πλάκα αναρρόφησης, στον ατέρμονα κοχλία, στο δακτύλιο λίπανσης, στο μηχανικό στεγανωτικό παρέμβυσμα, στο περίβλημα αντλίας, στο πώμα εκκένωσης, στο περίβλημα κινητήρα και στη σύζευξη εκκένωσης. Ανάλογα με τις συνθήκες εργασίας, η διάρκεια ζωής αυτών των εξαρτημάτων ενδέχεται να ποικίλλει σημαντικά και μπορεί να είναι μικρότερη από τη νόμιμη χρονική περίοδο της εγγύησης.