Construction of an office building, Spreeport

The Project:


Construction of an office building, 1st construction phase


Executing company:

HOCHTIEF Construction AG, Niederlassung Berlin

Responsible for setting up the construction site and for the technical equipment:

STREIF Baulogistik GmbH, Niederlassung Ost


The Problem:


Pumping off the storm water arising on the roofs during the construction phase.


Our Solution:


Eight type KTVE21.5 pumps with integrated electrode controls were installed in the shafts. The slim electrodes, which are attached, replace float sensors which take a lot of space and are maintenance-intensive. Only the motor line of the pump has to be relaid; no additional cables for float switches have to be connected.

Σε περίπτωση χρήσης λειαντικών και διαβρωτικών μέσω, σε ορισμένα εξαρτήματα θα υπάρξει πιο έντονη φθορά. Η προαναφερθείσα φθορά μπορεί να σημειωθεί κυρίως στην πτερωτή, στον αναδευτήρα, στην πλάκα αναρρόφησης, στον ατέρμονα κοχλία, στο δακτύλιο λίπανσης, στο μηχανικό στεγανωτικό παρέμβυσμα, στο περίβλημα αντλίας, στο πώμα εκκένωσης, στο περίβλημα κινητήρα και στη σύζευξη εκκένωσης. Ανάλογα με τις συνθήκες εργασίας, η διάρκεια ζωής αυτών των εξαρτημάτων ενδέχεται να ποικίλλει σημαντικά και μπορεί να είναι μικρότερη από τη νόμιμη χρονική περίοδο της εγγύησης.
Λόγω αυτού, θα πρέπει να δώσετε προσοχή στους γενικούς όρους και τις προϋποθέσεις μας τα οποία σας στέλνουμε μέσω email κατόπιν αιτήματος.