Direkt zum Inhalt | Direkt zur Navigation
Είστε εδώ:

Construction of an office building, Spreeport

The Project:


Construction of an office building, 1st construction phase


Executing company:

HOCHTIEF Construction AG, Niederlassung Berlin

Responsible for setting up the construction site and for the technical equipment:

STREIF Baulogistik GmbH, Niederlassung Ost


The Problem:


Pumping off the storm water arising on the roofs during the construction phase.


Our Solution:


Eight type KTVE21.5 pumps with integrated electrode controls were installed in the shafts. The slim electrodes, which are attached, replace float sensors which take a lot of space and are maintenance-intensive. Only the motor line of the pump has to be relaid; no additional cables for float switches have to be connected.

Σε περίπτωση χρήσης λειαντικού ή διαβρωτικού μέσου, μπορεί να προκληθεί μεγάλη φθορά σε ορισμένα εξαρτήματα. Αναφορικά με την παραπάνω εφαρμογή, μπορεί να προκληθεί φθορά κυρίως στην πτερωτή, στον αναδευτήρα, στην πλάκα αναρρόφησης, στο χιτώνιο ολίσθησης του άξονα, στον δακτύλιο λίπανσης, στo μηχανικό στεγανωτικό παρέμβυσμα, στο περίβλημα της αντλίας, στο φίλτρο, στο κιβώτιο του κινητήρα και στον άξονα σύζευξης του συστήματος αποστράγγισης. Η διάρκεια ζωής αυτών των εξαρτημάτων μπορεί να διαφέρει σημαντικά και μπορεί να είναι συντομότερη από εκείνη της περιόδου της εγγύησης κατά τον νόμο, εξαρτάται από τις συνθήκες εργασίας.
Όσον αφορά αυτό θα πρέπει να δοθεί προσοχή στους γενικούς όρους και κανονισμούς που σας έχουμε επίσης στείλει μέσω ταχυδρομείου κατόπιν αιτήματος.