Badische Stahlwerke GmbH, Kehl, Germany

The project:


Drainage of a shearing trench


Executing companies:

Biergans Pumpen-Vertrieb GmbH

Badische Stahlwerke GmbH, Kehl


The problem:


Pumping of abrasive and cinder-loaded water Water carrying cinders must be conveyed to a height of about 4 m, where it is reintroduced to the water circulation. The water is cooling water for the rolling process, which runs off into the shearing trench

over different paths. In the trench, there is a gravel curb to catch fragments from a shaping shear.


Our solution:


It was not possible to devise a normal drain for the water at a reasonable cost. The installation of a powerful, robust pump was thus the only practical solution.

Two model GPN3-80 pumps were provided, with one pump on standby. The pump in use is operated around the clock, seven days a week, without visible wear.

Σε περίπτωση χρήσης λειαντικού ή διαβρωτικού μέσου, μπορεί να προκληθεί μεγάλη φθορά σε ορισμένα εξαρτήματα. Αναφορικά με την παραπάνω εφαρμογή, μπορεί να προκληθεί φθορά κυρίως στην πτερωτή, στον αναδευτήρα, στην πλάκα αναρρόφησης, στο χιτώνιο ολίσθησης του άξονα, στον δακτύλιο λίπανσης, στo μηχανικό στεγανωτικό παρέμβυσμα, στο περίβλημα της αντλίας, στο φίλτρο, στο κιβώτιο του κινητήρα και στον άξονα σύζευξης του συστήματος αποστράγγισης. Η διάρκεια ζωής αυτών των εξαρτημάτων μπορεί να διαφέρει σημαντικά και μπορεί να είναι συντομότερη από εκείνη της περιόδου της εγγύησης κατά τον νόμο, εξαρτάται από τις συνθήκες εργασίας.