Danube power plant, Asten, Austria

The project:


Installation of a drain pump for the turbine inspection chamber.


Executing companies:

Verbund Austrian Hydro Power AG

Sonnek Engineering GmbH (Tsurumi partner)


The problem:


For inspection work the turbine must be completely drained at the intake and discharge including the headrace tunnel. New turbines are integrated in the collector shaft. Depending on the inspection cycle, the unfiltered water from the Danube must be pumped away there.

Pump requirement: 300m3/h at 3bar. Until now clean water submersible pumps were implemented which were always at risk of silting.


The solution:


Implementation of a type LH845 high-pressure pump with a 45kW rating. This conveys the existing pressure line at a pressure of 2.8bar 5m3/min.

Tsurumi contractors' pumps are perfectly suited for dirty media which means that they can also be operated after flooding (extreme silting).

Σε περίπτωση χρήσης λειαντικού ή διαβρωτικού μέσου, μπορεί να προκληθεί μεγάλη φθορά σε ορισμένα εξαρτήματα. Αναφορικά με την παραπάνω εφαρμογή, μπορεί να προκληθεί φθορά κυρίως στην πτερωτή, στον αναδευτήρα, στην πλάκα αναρρόφησης, στο χιτώνιο ολίσθησης του άξονα, στον δακτύλιο λίπανσης, στo μηχανικό στεγανωτικό παρέμβυσμα, στο περίβλημα της αντλίας, στο φίλτρο, στο κιβώτιο του κινητήρα και στον άξονα σύζευξης του συστήματος αποστράγγισης. Η διάρκεια ζωής αυτών των εξαρτημάτων μπορεί να διαφέρει σημαντικά και μπορεί να είναι συντομότερη από εκείνη της περιόδου της εγγύησης κατά τον νόμο, εξαρτάται από τις συνθήκες εργασίας.
Όσον αφορά αυτό θα πρέπει να δοθεί προσοχή στους γενικούς όρους και κανονισμούς που σας έχουμε επίσης στείλει μέσω ταχυδρομείου κατόπιν αιτήματος.