AZS ARGE Zugangsstollen, Linthal, Switzerland

The project:

Access shaft II -Kraftwerk Linth-Limmern AG "Project Linthal 2015"


Executing companies:

AZS ARGE Zugangsstollen

RL Pumpenanlagen GmbH, Wollerau


The problem:


Shafts with a pronounced tilt. drilling water and incoming water must be pumped out.


Our solution:


LH322W submersible pump is used, with a second pump held in reserve. The pump is frequency-controlled and regulated using a submersible pressure probe. If the water level rises, the speed is increased; when the water level falls, the speed is reduced. This type of control was chosen so that a very small pump container can be used which can be easily replaced after each new tunnel section. A model KTZ47.5 pump is built into the drainage water treatment.

Σε περίπτωση χρήσης λειαντικού ή διαβρωτικού μέσου, μπορεί να προκληθεί μεγάλη φθορά σε ορισμένα εξαρτήματα. Αναφορικά με την παραπάνω εφαρμογή, μπορεί να προκληθεί φθορά κυρίως στην πτερωτή, στον αναδευτήρα, στην πλάκα αναρρόφησης, στο χιτώνιο ολίσθησης του άξονα, στον δακτύλιο λίπανσης, στo μηχανικό στεγανωτικό παρέμβυσμα, στο περίβλημα της αντλίας, στο φίλτρο, στο κιβώτιο του κινητήρα και στον άξονα σύζευξης του συστήματος αποστράγγισης. Η διάρκεια ζωής αυτών των εξαρτημάτων μπορεί να διαφέρει σημαντικά και μπορεί να είναι συντομότερη από εκείνη της περιόδου της εγγύησης κατά τον νόμο, εξαρτάται από τις συνθήκες εργασίας.
Όσον αφορά αυτό θα πρέπει να δοθεί προσοχή στους γενικούς όρους και κανονισμούς που σας έχουμε επίσης στείλει μέσω ταχυδρομείου κατόπιν αιτήματος.