Direkt zum Inhalt | Direkt zur Navigation
Du er her:

Buchrain Tunnel Consortium, Switzerland

The project:


Construction of a road tunnel as part of the Rontal motorway feeder road


Executing companies:

ARGE Tunnel Buchrain

RL Pumpenanlagen GmbH, Bilten


The problem:


Provision of treated non-drinking water for the entire site; water intake from a nearby stream.


Our solution:


A KTZ33.7 pump is used to pump the untreated water out of the stream through a cyclone filter and into the water reservoir. The cyclone filter is used to separate off solids. The non-drinking water is supplied to the site via a pressure booster system.

I tilfælde af slibende og ætsende anvendelse vil stærkere slitage forekomme naturligt i visse komponenter. Med hensyn til ovenstående anvendelse kan slitage hovedsageligt finde sted i pumpehjul, omrørerenhed, sugeplade, akselhylster, oliering, mekanisk tætning, pumpehus, si, motorhus og udløbskobling. Afhængigt af arbejdsvilkårene kan levetiden for disse dele variere betydeligt og kan være kortere end den lovlige garantiperiode.
I den forbindelse skal du være opmærksom på vores generelle vilkår og betingelser , som vi også sender til dig via mail på anmodning.