Direkt zum Inhalt | Direkt zur Navigation
Du er her:

Rupp gravel plant, Dillingen, Germany

The project:


Preparation/clarification of rinse water from gravel processing


Executing company:

Josef Rupp GmbH&Co. KG


The problem:


The condensed slurry from the clarification tower is pumped into the buffer silos of the chamber filter press. The consistency of the medium ranges from fluid to a thickly flowing mud. Lime is added to the mud for conditioning.


Our solution:


The high proportion of abrasive sediments could not be pumped satisfactorily using the pumps in use until now. The result was a high degree of wear and replacement part costs.

I tilfælde af slibende og ætsende anvendelse vil stærkere slitage forekomme naturligt i visse komponenter. Med hensyn til ovenstående anvendelse kan slitage hovedsageligt finde sted i pumpehjul, omrørerenhed, sugeplade, akselhylster, oliering, mekanisk tætning, pumpehus, si, motorhus og udløbskobling. Afhængigt af arbejdsvilkårene kan levetiden for disse dele variere betydeligt og kan være kortere end den lovlige garantiperiode.
I den forbindelse skal du være opmærksom på vores generelle vilkår og betingelser , som vi også sender til dig via mail på anmodning.