Direkt zum Inhalt | Direkt zur Navigation
Du er her:

Lindner-Werke, Dettelbach, Germany

The Project:


Industrial manufacture of gypsum fibreboard panels


Companies involved:

Lindner GFT GmbH

Grebner Reinigungssysteme (Cleaning Systems)


The Problem:


Pumping of residual water containing gypsum from the production process, with a solids content of 15-20%. The pumps are required to operate in "on-snore-mode", with fluctuating delivery volumes.


The Solution:


Use of one pump each of the types KTV2-50 and KTV2-80 with stirring systems (weight 24kg and 37kg in each case). These types are easy to clean and, with the aid of the stirring systems, can pump water containing solids without any problems. First maintenance was carried out after 16 months, and the oil was absolutely perfect. The only replacements made were the shaft protection sleeve, the shaft sealing ring and the rubber parts of the pump housing.

I tilfælde af slibende og ætsende anvendelse vil stærkere slitage forekomme naturligt i visse komponenter. Med hensyn til ovenstående anvendelse kan slitage hovedsageligt finde sted i pumpehjul, omrørerenhed, sugeplade, akselhylster, oliering, mekanisk tætning, pumpehus, si, motorhus og udløbskobling. Afhængigt af arbejdsvilkårene kan levetiden for disse dele variere betydeligt og kan være kortere end den lovlige garantiperiode.
I den forbindelse skal du være opmærksom på vores generelle vilkår og betingelser , som vi også sender til dig via mail på anmodning.