Direkt zum Inhalt | Direkt zur Navigation
Du er her:

Petersdorf sewage treatment plant, Malchow, Germany

The project:

Renovation of the sewage treatment plant to permit reliable wastewater treatment in the tourist area for vacation season.


Executing company:

Malchow Municipal Utilities as customer

ROTARIA Energie- u. Umwelttechnik GmbH, Rerik


Tsurumi consultants:

Mr. Thomas Elendt (External sales force East)


The problem:

The eastern part of the Plauer See is characterised by tourism. As a result, the volume of wastewater triples during vacation season. The sewage treatment plant no longer reflected the state of the art and had insufficient capacity. The mechanically pretreated wastewater must be mixed with air to ensure nitrification and subsequent denitrification.


The solution:

The use of three Tsurumi BER immersible ventilators (ejectors) for oxygen enrichment of the wastewater in each of two basins. Simple installation and service in comparison with plate ventilation. The second basin is then put into operation as the number of vacationers increases or during service work.

I tilfælde af slibende og ætsende anvendelse vil stærkere slitage forekomme naturligt i visse komponenter. Med hensyn til ovenstående anvendelse kan slitage hovedsageligt finde sted i pumpehjul, omrørerenhed, sugeplade, akselhylster, oliering, mekanisk tætning, pumpehus, si, motorhus og udløbskobling. Afhængigt af arbejdsvilkårene kan levetiden for disse dele variere betydeligt og kan være kortere end den lovlige garantiperiode.
I den forbindelse skal du være opmærksom på vores generelle vilkår og betingelser , som vi også sender til dig via mail på anmodning.