Schwarzbach pipe heading, Germany

The Project:


Gelsenkirchen pipe heading, Schwarzbach canal, Germany

Executing company: WÜWA Bau GmbH


The Problem:


The material excavated by the micro-tunnelling machine is pumped by a mud pump into a separating system where coarse parts are separated. The remaining highly abrasive sludge is passed into a receiver. The material deposits due to the intermittent operation of the pump.


Our Solution:


A KRS2-80 with agitator whirls up the abrasive sludge so that it can be pumped off without any problem. Minimum wear is possible due to the application of components of grey cast and chromium cast iron (25% chromium portion).

I tilfælde af slibende og ætsende anvendelse vil stærkere slitage forekomme naturligt i visse komponenter. Med hensyn til ovenstående anvendelse kan slitage hovedsageligt finde sted i pumpehjul, omrørerenhed, sugeplade, akselhylster, oliering, mekanisk tætning, pumpehus, si, motorhus og udløbskobling. Afhængigt af arbejdsvilkårene kan levetiden for disse dele variere betydeligt og kan være kortere end den lovlige garantiperiode.
I den forbindelse skal du være opmærksom på vores generelle vilkår og betingelser , som vi også sender til dig via mail på anmodning.