Statentunnel, Netherlands

The Project:


Expansion of the Erasmus railway line between Rotterdam and The Hague.


Executing company:

Ed. Züblin AG

DuraVermeer Groep NVn


The problem:


Using a hydroshield, two 2.3km tunnels with diameter 6.78m will be constructed.During building works the lowering of the groundwater level must be assured.


The solution:


Multiple submersible pumps from the KTV and KTZ series. The special characteristics of Tsurumi pumps, such as an internal mechanical seal, upstream shaft sleeve with gasket and an oil lifter allow them to be used in on-snore-mode over an extended period.

I tilfælde af slibende og ætsende anvendelse vil stærkere slitage forekomme naturligt i visse komponenter. Med hensyn til ovenstående anvendelse kan slitage hovedsageligt finde sted i pumpehjul, omrørerenhed, sugeplade, akselhylster, oliering, mekanisk tætning, pumpehus, si, motorhus og udløbskobling. Afhængigt af arbejdsvilkårene kan levetiden for disse dele variere betydeligt og kan være kortere end den lovlige garantiperiode.
I den forbindelse skal du være opmærksom på vores generelle vilkår og betingelser , som vi også sender til dig via mail på anmodning.