Direkt zum Inhalt | Direkt zur Navigation
Du er her:

Schwäbisch Gmünd Tunnel, Germany

The project:


Construction of a two-lane tunnel with escape galleries to provide a direct route through the town of Schwäbisch Gmünd without the inconvenience of traffic lights at crossings, etc.


Executing companies:

  • Company Baresel
  • Company Hinteregger+Söhne Bauges. mbH
  • Company Züblin
  • Company Ostu-Stettin

The problem:


Tunnel advance using tunnel boring methods; advance on a downhill gradient at some points; incursion of ground and fissure water to be expected; tunnel bore to pass under the River Rems. High mud content due to soluble mudstone, high risk of abrasion due to quartz content of the sandstone.


Our solution:


Approximately 30 KTZ and KTV pumps with motor ratings up to 7.5 kW are being employed. These pumps are sturdy, requiring little maintenance; if any additional ones are required these can be supplied immediately on call-off at any time.

I tilfælde af slibende og ætsende anvendelse vil stærkere slitage forekomme naturligt i visse komponenter. Med hensyn til ovenstående anvendelse kan slitage hovedsageligt finde sted i pumpehjul, omrørerenhed, sugeplade, akselhylster, oliering, mekanisk tætning, pumpehus, si, motorhus og udløbskobling. Afhængigt af arbejdsvilkårene kan levetiden for disse dele variere betydeligt og kan være kortere end den lovlige garantiperiode.
I den forbindelse skal du være opmærksom på vores generelle vilkår og betingelser , som vi også sender til dig via mail på anmodning.