ICE railway track Airport Cologne-Bonn

The Project:


Underground railway track to link the Cologne-Bonn airport, Germany

Executing companies:

Consortium Airport tunnel Cologne-Bonn lot 3

Wayss & Freytag Ingenieurbau AG,

E. Heitkamp GmbH, F.C. Trapp AGComplete dewatering (24h-duty) carried out by:

Smet GWT N.V., Dessel, Belgien

Biergans Pumpen-Vertrieb GmbH, Duisburg



The Problem:


Open dewatering by means of submersible pumps.


Our Solution:


The groundwater generated is pumped off by several submersible pumps for abrasive water. 24-h on-snore-operation must be ensured. Currently a total of twenty KTZ21.5 and ten KTZ32.2 is in operation.

I tilfælde af slibende og ætsende anvendelse vil stærkere slitage forekomme naturligt i visse komponenter. Med hensyn til ovenstående anvendelse kan slitage hovedsageligt finde sted i pumpehjul, omrørerenhed, sugeplade, akselhylster, oliering, mekanisk tætning, pumpehus, si, motorhus og udløbskobling. Afhængigt af arbejdsvilkårene kan levetiden for disse dele variere betydeligt og kan være kortere end den lovlige garantiperiode.