Direkt zum Inhalt | Direkt zur Navigation
Du er her:

Construction of an office building, Spreeport

The Project:


Construction of an office building, 1st construction phase


Executing company:

HOCHTIEF Construction AG, Niederlassung Berlin

Responsible for setting up the construction site and for the technical equipment:

STREIF Baulogistik GmbH, Niederlassung Ost


The Problem:


Pumping off the storm water arising on the roofs during the construction phase.


Our Solution:


Eight type KTVE21.5 pumps with integrated electrode controls were installed in the shafts. The slim electrodes, which are attached, replace float sensors which take a lot of space and are maintenance-intensive. Only the motor line of the pump has to be relaid; no additional cables for float switches have to be connected.

I tilfælde af slibende og ætsende anvendelse vil stærkere slitage forekomme naturligt i visse komponenter. Med hensyn til ovenstående anvendelse kan slitage hovedsageligt finde sted i pumpehjul, omrørerenhed, sugeplade, akselhylster, oliering, mekanisk tætning, pumpehus, si, motorhus og udløbskobling. Afhængigt af arbejdsvilkårene kan levetiden for disse dele variere betydeligt og kan være kortere end den lovlige garantiperiode.
I den forbindelse skal du være opmærksom på vores generelle vilkår og betingelser , som vi også sender til dig via mail på anmodning.