Construction of a new culvert, Kleuterbach, Germany

The Project:


Replacement construction of the Kleuterbach culvert


Executing companies:

Johann Bunte GmbH&Co. KG

Bad Bentheim branch


The problem:


At km 42.431 N the Dortmund-Ems Canal passes over the upper Kleuterbach culvert. The planned channel widening of the Lüdinghausen–Senden section requires that the existing culvert be replaced. This will be built using the immersed-tube-method throughout its length. Submersible pumps will be necessary for floatingthe steel pipe culverts into place and sinking them.


The solution:


Pumps of types KTZ47.5 and KRS2-69 were used to control the flooding of the steel pipes and to sink them accurately.

I tilfælde af slibende og ætsende anvendelse vil stærkere slitage forekomme naturligt i visse komponenter. Med hensyn til ovenstående anvendelse kan slitage hovedsageligt finde sted i pumpehjul, omrørerenhed, sugeplade, akselhylster, oliering, mekanisk tætning, pumpehus, si, motorhus og udløbskobling. Afhængigt af arbejdsvilkårene kan levetiden for disse dele variere betydeligt og kan være kortere end den lovlige garantiperiode.
I den forbindelse skal du være opmærksom på vores generelle vilkår og betingelser , som vi også sender til dig via mail på anmodning.