Direkt zum Inhalt | Direkt zur Navigation
Du er her:

Bibra Tunnel, Germany

The Project:


The Bibra Tunnel is part of the German Unity construction project No. 8, the extension stretch on the route Nuremberg-Erfurt-Leipzig-Halle- Berlin.


Company involved:

Marti Tunnelbau Bunte


The Problem:


Maintaining water clearance by means of submersible pumps at the tunnel portals and during the tunnel advance.


The Solution:


Use of Tsurumi dirty water submersible pumps of widely differing types to remove water from the tunnel. Thanks to their tough, robust design, and the special internally-located slide-ring seal, Tsurumi pumps can be kept permanently in operation in "on-snore-mode".

I tilfælde af slibende og ætsende anvendelse vil stærkere slitage forekomme naturligt i visse komponenter. Med hensyn til ovenstående anvendelse kan slitage hovedsageligt finde sted i pumpehjul, omrørerenhed, sugeplade, akselhylster, oliering, mekanisk tætning, pumpehus, si, motorhus og udløbskobling. Afhængigt af arbejdsvilkårene kan levetiden for disse dele variere betydeligt og kan være kortere end den lovlige garantiperiode.
I den forbindelse skal du være opmærksom på vores generelle vilkår og betingelser , som vi også sender til dig via mail på anmodning.