AZS ARGE Zugangsstollen, Linthal, Switzerland

The project:

Access shaft II -Kraftwerk Linth-Limmern AG "Project Linthal 2015"


Executing companies:

AZS ARGE Zugangsstollen

RL Pumpenanlagen GmbH, Wollerau


The problem:


Shafts with a pronounced tilt. drilling water and incoming water must be pumped out.


Our solution:


LH322W submersible pump is used, with a second pump held in reserve. The pump is frequency-controlled and regulated using a submersible pressure probe. If the water level rises, the speed is increased; when the water level falls, the speed is reduced. This type of control was chosen so that a very small pump container can be used which can be easily replaced after each new tunnel section. A model KTZ47.5 pump is built into the drainage water treatment.

I tilfælde af slibende og ætsende anvendelse vil stærkere slitage forekomme naturligt i visse komponenter. Med hensyn til ovenstående anvendelse kan slitage hovedsageligt finde sted i pumpehjul, omrørerenhed, sugeplade, akselhylster, oliering, mekanisk tætning, pumpehus, si, motorhus og udløbskobling. Afhængigt af arbejdsvilkårene kan levetiden for disse dele variere betydeligt og kan være kortere end den lovlige garantiperiode.
I den forbindelse skal du være opmærksom på vores generelle vilkår og betingelser , som vi også sender til dig via mail på anmodning.