Extension of connection road L639 in Gelsenkirchen

The Project:


Extension of the connection road L639,

Florastraße Gelsenkirchen

Executing company:

Heitkamp Erd- und Straßenbau GmbH


The Problem:


Repumping a mixed water channel because a shaft had to be installed.


Our Solution:


Two Tsurumi KRS822 pumped off the dammed water. 720 m³/h were re-passed into the mixed water channel at a distance of 100 m.


This took 3 weeks where the pumps were in service 24 h a day without any failure.


The pumps were laid into the bed of the channel without further installation. No problem for Tsurumi pumps.

I tilfælde af slibende og ætsende anvendelse vil stærkere slitage forekomme naturligt i visse komponenter. Med hensyn til ovenstående anvendelse kan slitage hovedsageligt finde sted i pumpehjul, omrørerenhed, sugeplade, akselhylster, oliering, mekanisk tætning, pumpehus, si, motorhus og udløbskobling. Afhængigt af arbejdsvilkårene kan levetiden for disse dele variere betydeligt og kan være kortere end den lovlige garantiperiode.