Direkt zum Inhalt | Direkt zur Navigation
Zde se nacházíte:

Petersdorf sewage treatment plant, Malchow, Germany

The project:

Renovation of the sewage treatment plant to permit reliable wastewater treatment in the tourist area for vacation season.


Executing company:

Malchow Municipal Utilities as customer

ROTARIA Energie- u. Umwelttechnik GmbH, Rerik


Tsurumi consultants:

Mr. Thomas Elendt (External sales force East)


The problem:

The eastern part of the Plauer See is characterised by tourism. As a result, the volume of wastewater triples during vacation season. The sewage treatment plant no longer reflected the state of the art and had insufficient capacity. The mechanically pretreated wastewater must be mixed with air to ensure nitrification and subsequent denitrification.


The solution:

The use of three Tsurumi BER immersible ventilators (ejectors) for oxygen enrichment of the wastewater in each of two basins. Simple installation and service in comparison with plate ventilation. The second basin is then put into operation as the number of vacationers increases or during service work.

V případě použití v abrazivním a korozivním prostředí dochází přirozeně k silnějšímu opotřebení určitých součástí. S ohledem na výše uvedené použití může opotřebení probíhat především v oběžném kole, míchadle, sací desce, hřídelovém pouzdře, olejovém kroužku, mechanickém těsnění, plášti čerpadla, sítu, skříni motoru a výtlačné spojce. V závislosti na pracovních podmínkách se životnost těchto částí může výrazně lišit a být kratší než zákonná záruční lhůta.
V této souvislosti věnujte pozornost všeobecným obchodním podmínkám, které vám na žádost zašleme také e-mailem.