The project:

City bypass for federal road B23 - 450m groundwater tank through the Saulgrub upland moor between Saulgrub and Unterammergau.


Executing company:

HOCHTIEF Infrastructure GmbH, Southeast Germany branch


Tsurumi consultants:

Mr. Christian Kulik (External sales force Bavaria)


The problem:

During implementation of the Saulgrub bypass, a 450m seciond of federal road B23 had to be taken through an underpass under the Murnau-Oberammergau railway. The area is permanently underwater, and ground and strata water also entered. Water retention using well pumps is essential.


The solution:

Open water retention using small, single-phase model HS2.75S wastewater pumps, controlled by float switches. Three-phase model KTV2-15 and KTV2-22 wastewater pumps run in 24-hour sip operation.

Download

V případě použití v abrazivním a korozivním prostředí dochází pochopitelně u některých komponentů k rychlejšímu opotřebení. S ohledem na výše uvedené aplikace může docházet k opotřebení zejména na oběžném kole, agitátoru, přísavné desce, hřídelové objímce, olejovém kroužku, mechanickém utěsnění, krytu čerpadla, sítku, krytu motoru a na spoji v místě pro uvolňování materiálu. V závislosti na pracovních podmínkách se může životnost těchto částí výrazně lišit. Může být kratší než doba zákonné záruky.