Direkt zum Inhalt | Direkt zur Navigation
Jste zde:

East Butterwick Pumpstation, UK

The project:


Renovation of a pump station in East Butterwick, North Lincolnshire, Great Britain


Executing companies:

T-T Pumps Ltd., Cheshire

Messingham Internal Drainage Board


The pump station was built after the Second World War and is used to pump off flood water.


The problem:


In 1981 our partner, T-T Pumps Ltd., equipped this pump station with two TO500B855 units, each with a 55kW power rating.

900 litres per second is moved at a height of 4,5m. The operating range should additionally be between 0m and 7,5m.

Although the pumps have run for twenty-three years without failure or need for spare parts, the Messingham Internal Drainage Board decided in 2004 that the pumps had reached the end of their lifespan.


Our solution:


Again, T-T Pumps Ltd. won the bid. The solution that was offered was simple and inexpensive: In 2005 it was possible to employ two new type TO500B855 pumps of the latest design to be operated for another 24 years – without risks or large-scale reconstruction.


The installation of the pump control developed by T-T Pumps Ltd. has now made it possible for the pump station to be used for draining the surrounding fields during dry periods.

Download

V případě použití v abrazivním a korozivním prostředí dochází pochopitelně u některých komponentů k rychlejšímu opotřebení. S ohledem na výše uvedené aplikace může docházet k opotřebení zejména na oběžném kole, agitátoru, přísavné desce, hřídelové objímce, olejovém kroužku, mechanickém utěsnění, krytu čerpadla, sítku, krytu motoru a na spoji v místě pro uvolňování materiálu. V závislosti na pracovních podmínkách se může životnost těchto částí výrazně lišit. Může být kratší než doba zákonné záruky.
V tomto ohledu prosím věnujte pozornost našim všeobecným obchodním podmínkám, které vám můžeme na základě vyžádání zaslat poštou.