Waste water channel, Belgrade, Serbia

The Project:


Construction of a waste-water channel in Belgrade with 1500mm diameter


Executing companies:

Ferbild d.o.o., Belgrade

Vedir-Impex d.o.o.


The problem:


Laying of pipes with 1500mm diameter at a depth of 8m. Proximity to the Danube means that groundwater occurs at only 3m depth. Accordingly, the construction site was 5m below the groundwater level along its entire length. Since the ground contains a high proportion of grit, difficulties were encountered in lowering the groundwater.


The solution:


12 wells sunk to depths of up to 25m were drilled parallel to the new canal. At this depth the ground consists of shingle and groundwater could be pumped with ease. 15 Tsurumi pumps were used, of types KTZ611,KTZ35.5, KTZ22.2, KTVE35.5 and LH615.

V případě použití v abrazivním a korozivním prostředí dochází přirozeně k silnějšímu opotřebení určitých součástí. S ohledem na výše uvedené použití může opotřebení probíhat především v oběžném kole, míchadle, sací desce, hřídelovém pouzdře, olejovém kroužku, mechanickém těsnění, plášti čerpadla, sítu, skříni motoru a výtlačné spojce. V závislosti na pracovních podmínkách se životnost těchto částí může výrazně lišit a být kratší než zákonná záruční lhůta.
V této souvislosti věnujte pozornost všeobecným obchodním podmínkám, které vám na žádost zašleme také e-mailem.