Direkt zum Inhalt | Direkt zur Navigation
Jste zde:

Pump Testing Days, Fürth, Germany

The Project:


Pump testing days at the premises of Gebr. Mayer, electrical and mechanical testing


Companies involved:

Gebr. Mayer GmbH&Co. KG, Fürth


The Problem:


Testing the pumps in accordance with the health and safety regulations at work "BGV A3" applied for machinery with changing locations.


Our Support


Testing the pumps at the premises of the company Gebr. Mayer within the framework of the on-site standardization day. Electrical testing with the aid of a calibrated Secutester, mechanical testing (oil, parts subject to wear, cables). Once the tests had been successfully passed, the pump was issued with a test sticker for the next six months. Cable repairs were carried out on the spot, as was the replacement of the impeller, the shaft protection sleeve, the lip sealing ring, and the wear plate.

Download

bild1

bild2
V případě použití v abrazivním a korozivním prostředí dochází pochopitelně u některých komponentů k rychlejšímu opotřebení. S ohledem na výše uvedené aplikace může docházet k opotřebení zejména na oběžném kole, agitátoru, přísavné desce, hřídelové objímce, olejovém kroužku, mechanickém utěsnění, krytu čerpadla, sítku, krytu motoru a na spoji v místě pro uvolňování materiálu. V závislosti na pracovních podmínkách se může životnost těchto částí výrazně lišit. Může být kratší než doba zákonné záruky.
V tomto ohledu prosím věnujte pozornost našim všeobecným obchodním podmínkám, které vám můžeme na základě vyžádání zaslat poštou.