Direkt zum Inhalt | Direkt zur Navigation
Zde se nacházíte:

Inland waterway canal Hohenems, Austria

The Project:


Construction of the inland waterway canal as well as the installation of concrete girders for securing purposes in Hohenems, Austria


Executing company:

Hilti & Jehle, Feldkirch, Austria


The Problem:


Pumping off dirty water with high levels of sludge (turf, humus, sand).


Our Solution:


Use of two Tsurumi KRS2-100s with agitator in baskets with 30 mm perforations. The stirrer mounted on the shaft swirls up the medium and ensures that slick, sand and sludge can be conveyed away without any problem. In this way the pump basket remains unclogged and the pump line does not get blocked. In this way the work of one man for maintaining the pumps and pressure line was saved. Previously the pumps had to be frequently opened and the silted-up pipes dried and cleaned.

V případě použití v abrazivním a korozivním prostředí dochází přirozeně k silnějšímu opotřebení určitých součástí. S ohledem na výše uvedené použití může opotřebení probíhat především v oběžném kole, míchadle, sací desce, hřídelovém pouzdře, olejovém kroužku, mechanickém těsnění, plášti čerpadla, sítu, skříni motoru a výtlačné spojce. V závislosti na pracovních podmínkách se životnost těchto částí může výrazně lišit a být kratší než zákonná záruční lhůta.
V této souvislosti věnujte pozornost všeobecným obchodním podmínkám, které vám na žádost zašleme také e-mailem.