Waste water channel, Belgrade, Serbia

The Project:


Construction of a waste-water channel in Belgrade with 1500mm diameter


Executing companies:

Ferbild d.o.o., Belgrade

Vedir-Impex d.o.o.


The problem:


Laying of pipes with 1500mm diameter at a depth of 8m. Proximity to the Danube means that groundwater occurs at only 3m depth. Accordingly, the construction site was 5m below the groundwater level along its entire length. Since the ground contains a high proportion of grit, difficulties were encountered in lowering the groundwater.


The solution:


12 wells sunk to depths of up to 25m were drilled parallel to the new canal. At this depth the ground consists of shingle and groundwater could be pumped with ease. 15 Tsurumi pumps were used, of types KTZ611,KTZ35.5, KTZ22.2, KTVE35.5 and LH615.

При употреба на абразивни и корозивни материали, в някои компоненти естествено ще се появи силно износване. Във връзка с по-горното приложение, износване ще възникне предимно в импелера, агитатора, засмукващата плоча, ръкава на вала, масления пръстен, механичното уплътнение, корпуса на помпата, цедката, корпуса на двигателя и смукателния куплунг. В зависимост от условията на работа на експлоатационният живот на официалния гаранционен срок.
В тази връзка, моля, обърнете внимание на нашите общи условия които ние също ще ви изпратим по пощата при поискване.